Rooftop solar site survey checklist for Indian installers

Everything to capture on a rooftop solar site visit: roof size and shade, structure, electricity supply, meter and DB, cable route, earthing, photos and feasibility, so the quotation is right the first time.

3 min read · Updated 02 Nov 2026

A good site survey decides three things: how big the system can be, what it will cost to install, and whether anything will cause trouble later. Miss one detail (a staircase room's shadow, a three-phase meter, a 40 m cable run) and the quotation is wrong, the margin disappears, or the customer is unhappy.

Use this checklist on every visit. It takes 20–30 minutes once your team is used to it.

1. Customer and electricity details

The sanctioned load matters: for net metering, many DISCOMs limit the solar size to the sanctioned load. If the customer needs more, a load enhancement application comes first.

2. Roof measurements

3. Shade

Walk the roof at least once and note everything that casts a shadow:

Write down when the shade falls (morning or evening). Morning and evening shade costs much less generation than shade between 10 am and 3 pm.

4. Structure

5. Electrical

6. Practical things

7. Photos to take every time

  1. Full roof (two corners)
  2. Shading objects
  3. Electricity meter
  4. Distribution board
  5. Inverter spot
  6. Electricity bill
  7. A quick line diagram or sketch with dimensions

8. Feasibility

Finish the visit with a clear call: Feasible, Feasible with changes (e.g. elevated structure, load enhancement) or Not feasible, and the recommended size in kW.

Do it on the phone, not on paper

In Nithyam, the solar site survey already has every field above, a photo checklist that shows what is still missing, and a feasibility status. The office sees the survey the moment it is saved, and the quotation can be filled from the system size in one tap.